This service is for businesses that already have a warehouse or industrial unit and need it upgraded: new offices and welfare inside the shed, better layout and storage, new lighting and power, floors, fire safety and finishes. If you need a new warehouse built from the ground up, see warehouse construction.
| Project | Scope | Size | Programme |
|---|---|---|---|
| Banbury Warehouse, Oxfordshire | New welfare and storage inside a live warehouse, £380K | 148 m² | 4 weeks |
| Drake's warehouse, London | Railway-arch warehouse converted into offices, studio, production and dispatch, £200K | 500 m² | 8 weeks |
| Hackney warehouse, London | Full engineering systems overhaul, 6 m ceilings | 120 m² | 4 weeks |
More detail: what is a warehouse fit-out and fit-out vs renovation.
Yes. Most of our warehouse projects are live sites. On the Banbury warehouse we built new welfare and storage in 4 weeks around continuing operations.
A fit-out adds what your operation needs inside the building — offices, welfare, racking, power. A refurbishment repairs and upgrades the building itself — floors, roof, lighting, heating. Most projects combine both.
Smaller fit-outs of 100–500 m² typically take 4–8 weeks on site. Larger or phased projects take longer. You get a fixed programme with your cost plan.
Yes. We are based in London and deliver warehouse projects across the South East and the Midlands, such as Banbury in Oxfordshire.
Craftex takes on construction projects from £100k.
Need your warehouse upgraded without stopping operations? Tell us the size and what you need. We survey the unit and give you a fixed programme and a line-by-line cost plan.
Request a callback07403 928666
Whether it’s a full refurbishment or a tailored CAT A fit-out, or CAT B, our team delivers solutions that are practical, modern, and built to last. We’re not just updating your space—we’re helping you get more out of it, every day.
Frequently Asked Questions